Building the Future construction & referendum info


Building the Future construction & referendum info
Where can I find more Building the Future information on this website?
D203 Decision for the Future logoVisit the Building the Future page.
Back to Top

Where can I find information about the current status of each of the construction/renovation projects?

See these web pages:

Naperville Central Major Renovation and Additions
Ann Reid Early Childhood Center Construction
Naperville North Improvements
Mill Street Renovations and Additions

Back to Top
Buildings: Will there be enough classrooms provided in the NCHS renovation plan?
Based on demographic projections from an outside consultant, a renovated NCHS is being built for slightly over 2800 students. When a newly-renovated building opens, there are expected to be 2800 students enrolled. If enrollment is higher than 2800, space will be maintained in the basement area until the enrollment declines below 2800 (expected to occur in 2013-14) and that area can then be “de-commissioned” and used for storage. Current demographer’s projections have Naperville Central declining to 2600 students in 2015-16 and staying roughly at that level.
Back to Top
Buildings: What about repairs to roofs, boilers, heating/air conditioning and other infrastructure systems?
Areas of major renovation include upgrades to infrastructure systems as part of the project cost. In areas of minor renovation, project funds, especially contingency funds,  can be used to replace systems with low life expectancies (e.g., HVAC systems with less than a projected life of 15 years). For areas that are untouched or relatively untouched in the renovation effort, annual District maintenance money is available to replace infrastructure systems on an ongoing basis as necessary. 
Back to Top
Buildings: What percentage of Central’s building will be “touched?”
It is estimated by our architects that approximately 75% of the building will be "touched" in some way. The two major areas that are not included in the renovation are the pool and auditorium, which were both built in 1992. The basement area will remain as is, as noted in the answer to the question "NCHS: Will there be enough classrooms provided in the NCHS renovation plan?"
Back to Top
Buildings: What about the safety and comfort of students and staff during construction? Will safety be compromised?

No. Many school systems have handled building renovation safely while schools are in session. Clearly, our goal is to do as much of the major construction work as possible over the summer and during breaks. All federal laws and OSHA guidelines regarding health and safety issues (e.g., asbestos abatement) will be followed, as the District as done in the past. A phasing plan for this project (and the others) will be developed prior to the start of construction. 

If a referendum is approved, the detailed site and design work will need to be done before any construction begins; this will take several months. With regard to Naperville Central, in particular, the plan is for the new additions to be completed first so students can move into those areas (e.g., new science labs) so other areas of the building can be sealed off and remodeled. Any major renovation creates dust and inconvenience for short periods of time, but student safety and instruction won’t be compromised.

Back to Top
Buildings: Will a major renovation have a significant enough “shelf life” to make it viable?
A $87 million renovation of NCHS is projected to be good for a minimum of 40-50 years, perhaps longer, although ongoing routine maintenance is of course required.
Back to Top
Buildings: Why is it necessary to have bigger classrooms at Central?
Curriculum delivery is much different now than in the past. Students going into the business world, for example, are expected to be able to comfortably work in groups to accomplish tasks and to be proficient in technology. These are just two reasons why high school classrooms today need to be bigger than in the past. In addition, a major “problem” at Central is the way classroom, corridors, and building configurations were built as the school expanded rapidly to meet increased enrollments. Today, departments are fragmented, corridors can’t handle student passages at peak times, and students are forced to go back and forth across the building multiple times daily, which is a problem of time and efficiency.
Back to Top
Buildings: How are Naperville North High School’s needs being addressed?
The most critical areas for educational improvement and safety at Naperville North are being addressed in this referendum proposal. Classroom size and science lab size at North are generally adequate and larger than similar existing classrooms at Central. Building infrastructure is likewise sound, and maintenance issues are addressed on an ongoing and as-needed basis (e.g., replacement of roofs and aging HVAC systems). A major renovation of Naperville North will not be needed for many years, as the building is newer and was built in a more efficient way. Nonetheless, improvements (both major and minor) will continue to be made to the building as necessary (e.g., a new field house floor and bleachers will be installed in the next year or two). Current temporary crowding issues are being efficiently addressed with modular classrooms that are temporarily installed to bridge any potential overcrowding. An addition would incur millions in storm water retention costs.
Back to Top
Buildings: How was the list of facilities needs that formed the basis of the Master Facilities Plan generated?
The infrastructures of all schools were studied intensively by independent architects at the beginning of the facilities planning process. The same architects then met with parents, staff, and administrators at each school to look at educational needs. From that study, came a list of the highest priority needs of all District 203 schools. Once the Facilities Task Force met, they also reviewed future needs, which is one of the reasons the Early Childhood Center (ECC) is part of the facilities plan. The end result was a five-year Board-adopted Master Facilities Plan that addresses the most pressing District needs.
Back to Top
Buildings: Why doesn’t the District Master Facilities Plan address all District schools?

As noted above, all schools were studied at the beginning of the facilities planning process. The draft Master Facilities Plan did address almost all of them; see page 27, on this website: http://www.naperville203.org/assets/MasterFacilitiesPlanWeb.pdf.

Some or all of these projects will be addressed as part of the annual Operations and Maintenance (O&M) budget, e.g., permanent walls at Steeple Run, Scott and Maplebrook Elementary Schools. Other items identified (e.g., a junior high running track and gyms/multipurpose rooms at all elementary schools) did not garner strong support in our recent facilities survey and would require more study and input to determine future direction.

That leaves four projects that required more study and possible funding in the next ten years: LRC and classroom remodeling at Beebe, movement of music classroom upstairs from the basement at Highlands, LRC and PE space remodeling at Lincoln, and LRC remodeling at Jefferson. If the referendum is approved, it is hoped that some or all of these projects could be funded from “freed” annual maintenance funding already allocated within current and future budgets. The District anticipates that substantial funds from that account will not be needed to maintain Naperville Central and Mill Street Schools should the referendum be successful. Such an approach is similar to what the District did in the late 90s in using operating funds to build LRC additions to Naper and Ellsworth, and other additions to Mill, Beebe, Madison, Lincoln, and Jefferson.

The best estimate for when the next comprehensive look at District facilities, with community input, would probably occur is six to ten years from now.

Back to Top
Buildings: If the referendum doesn’t pass, would it be more likely that a new Central would be built?

A brand new Naperville Central will not be built for several reasons. First, there is really no viable site for a new high school that could easily be secured in a reasonable amount of time and at a reasonable cost, and there was strong negative community reaction to relocating the high school elsewhere on the Martin Mitchell property. Second, while it is true that the results of informal community feedback during the “Touch the Future” Community Engagement initiative indicated almost 70% preferred a new high school be built in lieu of renovation, an independent random telephone survey of 400 voters indicated that only 31% of residents would support such an option. Third, even if that sentiment might change over time, a new high school would be very costly (over $140 million), with project cost escalation of an additional four to seven percent per year. Finally, and most importantly, delaying renovations of Naperville Central any longer, particularly because of the problems with the science labs, is not in our children’s educational interest. Asking voters to build a new school without having secured a viable site is also problematic.

What is frequently overlooked in discussion of this issue is that the amount of proposed renovations and additions to Naperville Central are extensive. Plans call for renovation of over 75% of the building to make it as "new" as possible.

Back to Top
Buildings: Have teachers and staff members at the schools been involved in design planning?
Yes. Teachers and administrators at Naperville Central High School have had several lengthy meetings in the last six months with our architects to refine concept plans and explore cost-effective improvements. In the same way, staff at Mill Street Elementary and the ECC will be involved in reviewing preliminary site plans for those buildings. Because the Board elected not to spend money unnecessarily for detailed building designs until a clear direction was set by voters, there will be several months of detailed site and design work prior to the beginning of construction. While some overall design modifications are anticipated, the District will ensure that any future design changes or modifications will occur within budget.
Back to Top
Buildings: Is it a goal to renovate all District schools (elementary, junior high, and high schools) to one “standard?”
Illinois, unlike some states, does not have an official standard for schools at each level. With regard to the District’s long-term facilities planning, our goal needs to be building equity, not building equality. Thus, our focus must always be on providing comparable and equitable curriculum and services in each of our schools. It is not reasonable or cost-effective to renovate each building to any one standard, as enrollments will fluctuate and building needs will vary.
Back to Top
Buildings: Will the proposed plans for Central affect the Boy Scouts (Von Oven Park) or the Sportsman’s Club?
These areas will not be impacted by the proposed renovations. There was strong community interest in leaving these areas intact.
Back to Top
Buildings: Has the redrawing of attendance areas been considered to reduce the cost of the plan?
Yes, and consideration of this option continues, based on strong input during the Community Engagement portion of the facilities planning process. As a result of community input during the Facilities Community Engagement process, the proposed cost of renewal at Mill Street Elementary School was reduced by $4 million because of a potential shift of attendance areas that would reduce crowding at that school once a new Early Childhood Center was open (in 2009 or 2010). No final decision can be made on attendance areas this far in advance because there have been substantial fluctuations in enrollment at the two schools most directly involved. The District will continue to monitor the feasibility of this option as the details and enrollment trends become clearer.
Back to Top
Buildings: What will happen if the referendum fails?

During the Community Engagement portion of the facilities planning process, Option B was discussed as the one that would be used if a referendum failed. That option includes spending as little as possible on Central now (e.g., fixing the science labs where they are, even though current room size is too small), and re-evaluating a more complete renovation at some later date. Option B also included less money for improvements at Naperville North and Mill Street Elementary.

Naturally, there is always a possibility that if the final vote was “close,” the Board of Education could consider placing a similar question on a future ballot. It would most likely be at a higher cost, with a resulting delay in project completion.

Back to Top
Buildings: Are the concept plans and drawings final, or could they be changed?
Because the Board of Education made the decision to not spend money on detailed designs, permitting, and city and state agency review until the facilities plan had been taken to the voters, it is quite possible that current conceptual plans could be revised to some extent. What the District is committing to, however, is that any such design revisions will be within the projected budget approved by voters.
Back to Top
Buildings: Why is there a need to enlarge the classrooms at Central?

Because Naperville Central had so many additions over so many years, classroom sizes there vary, but regular classrooms in the older section of the building are generally 660 sq. ft. or less. Also, a study of the amount of square footage at Central, compared to its neighbors showed Central to be well below the average of its peers.

While there is no one universally accepted standard size for a regular high school classroom, most architects recommend 800-900 sq. ft. of space per classroom and that has become a general “rule of thumb.” Likewise, the CEFPI (Council of Education Facility Planners International) guideline is 30 square feet per student. So for 30 students that would be 900 square feet. But again, CEFPI describes their guideline as just that – a general guide. 

In the renovated classrooms at Naperville Central, our goal is to provide roughly 775-800 sq. ft. of space for most classrooms; science labs and technology labs, on the other hand, will be in the recommended range of 1100-1200 square feet. These guidelines provide space for students, workspace, storage, and flexible classroom lay-out. The reason that classrooms have become larger relates to the learning activities going on in the room and the use of technology as a teaching/learning tool. Such activities require more flexible space for work groups and project execution. No longer are classrooms solely designed around the traditional classroom model where students sit in rows and listen to teachers lecture. In addition to merely being overcrowded, small class room size is proving to be an impediment to curriculum delivery, as the District is working to infuse 21st century skills into students’ learning experiences. Finally, research has shown that students learn in different ways and the classrooms being designed for the future are responding to those needs. As the renewal of Naperville Central moves through the design process, there will be ongoing discussions with the individual departments to design the right size (and shaped) classrooms for each subject area.

Back to Top
Buildings: Why does the referendum proposal include the expansion of an elementary hot lunch program to all schools?
A small pilot program to provide a daily hot lunch for all elementary students has proven that such a program is financially viable and self-supporting. But the District has no space large enough to house such a program, and most elementary schools do not have extra space for a prep kitchen. Passage of the referendum is a unique opportunity to provide a cost-effective nutritional option for elementary schools by building a kitchen at Central which would be large enough to produce lunches for the elementary students who wish to pay for it
Back to Top
ECC: Why is an Early Childhood program necessary?

Legal mandates (Federal and State) require school districts to provide appropriate educational programs for children with special needs beginning on the child’s third birthday. This legal mandate also requires the District to provide classrooms for children with special needs that include typical peers as part of the class, since typical peers serve as role models. Families of typical peers pay tuition to attend the program. Because of the variance of needs that must be addressed, the end result is that several different types of programs must be provided at the Early Childhood level.

Back to Top
ECC: What are the different types of Early Childhood programs?
Naperville District 203 provides the following type of Early Childhood programs: 1) Instructional, 2) Extended Instructional, 3) Blended – with typical peers, 4) Phonological – significant speech issues, 5) At-risk or Springboard classes (paid by State grant).
Back to Top
ECC: Does the Early Childhood program make a difference for children?
Yes. About 90% to 95% of the children coming from Early Childhood go on to their home school’s kindergarten program with varying levels of support. The investment at this early level has an incredible payback. Some children no longer need Special Education services at all as a result of Early Childhood education. One study indicated that for every $1 spent at the Early Childhood level, $7 was saved on services needed in the future.
Back to Top
ECC: Are there Early Childhood classes for children without special needs?
Yes, State funding provides classrooms for children who are at-risk for various reasons. These are children whose families cannot afford private preschool. They may not speak English or they may have other family stressors that would impede them from academic progress. These programs give the students a head start on their academics and provide incredible benefits as they move onto kindergarten. The State pays for most of these programs, with the District providing some support. There are classrooms that are a combination of children with special needs, who require a general education class, and typical peers, who pay tuition.
Back to Top
ECC: Why can’t the Early Childhood program stay at Elmwood School, where it has always been?
  • The Early Childhood program has outgrown the space at Elmwood Elementary School by a considerable margin.
  • Five years ago, there were five classrooms at Elmwood. Last year, there were 11 classrooms located at five elementary schools across the District.
  • Five years ago, there were 137 children in classrooms; last year the program had grown to 260 children in classrooms (including 100 itinerant students).
  • The number of children receiving services in classrooms in the past five years has nearly doubled, and the program continues to grow. Classroom space is a major issue and a challenge every time it becomes necessary to open a new class.
Back to Top
ECC: Are there other Early Childhood programs besides classroom programs?
Along with these classroom programs, speech and language services are provided for approximately 100 children, ages three and four. Through a State grant, a “Parents as Teachers” program with in-home parent education for at-risk children from birth through age five is also offered. All of these programs require additional space and resources. These programs are also scattered at various elementary schools across the District, wherever there is space.
Back to Top
ECC: Why the growth in the Early Childhood program?

More children are being identified with special needs at an earlier age and more parents are seeking help because of their awareness that the earlier the intervention, the greater the progress their child will make.

  • There is a significant increase in children being identified with autism.  All of these children benefit significantly from early intervention and Early Childhood education.
  • Medical advances are helping more children survive, along with an increase in premature births and children who are medically fragile.
  • There has been growth in Early Childhood education across the country.
Back to Top
ECC: Are there other problems with the Early Childhood facilities themselves?
The classrooms are not designed for young children. Every kindergarten class in District 203 has a bathroom and a sink inside the classroom. There are several classes for three- and four-year-olds that do not have bathrooms or sinks. The playgrounds and size of the classrooms are not designed for very young children. Drop-off procedures for children are different at each school and some are not as safe for young children as they should be. Many of the classrooms that are located in elementary schools are sharing a kindergarten room for half the day. Staff has to rearrange the room daily to accommodate younger children and their equipment.
Back to Top
ECC: How does the lack of one centralized location affect the Early Childhood staff?
Teachers of Early Childhood are sometimes isolated in buildings with no teacher with whom they can team. The lack of other teachers who are teaching at the same level greatly impedes the ability to collaborate and improve the program. Support staff spends an inordinate amount of their day traveling from building to building to support the program and students. On occasion, a teacher or assistant might be in one Early Childhood class in one building in the morning, and have to travel to another building for a different class for the afternoon.
Back to Top
ECC: Are there other impacts by not having an Early Childhood Center?
An Early Childhood Home & School Association does not currently exist; the scope of reaching out to all the parents at so many different schools makes it impossible. There are limited opportunities for any evening parent education events; parents are most comfortable attending events at the school their child attends.
Back to Top
ECC: Why is it necessary to bus Early Childhood students to a school not in their attendance area?
Children must be placed in classes that match their needs, so it is very likely that a child who lives in the River Woods attendance area might best be served by attending a class at Beebe School. There are some children (three- and four-year-olds) on buses for as long as an hour, because of the distance between stops to pick up other children and because they are being transported across town.
Back to Top
ECC: How would a centralized Early Childhood location help the students?
Consistency is very important for young children, particularly children with special needs. In some instances, a child needs one type of program which is at one school, and then their needs change. Rather than just changing classrooms, they have to change schools, because the program they need is at a different school. No parent wants his/her child to keep changing schools at such a young age, when consistency plays such an important role in their success.
Back to Top
ECC: What do other districts do about Early Childhood?

Many surrounding districts have built a centralized Early Childhood Center; examples include:

Naperville – Indian Prairie 204, Plainfield District 202, Bolingbrook – Valley View District 365U, Wheaton District 200 and Oswego District 302 have Early Childhood Centers because they recognize that it is the most cost efficient and it is the most worthwhile investment in the future of Early Childhood.

With the increasing recognition of how important learning is at an early age and the political awareness of this investment (Preschool for All legislation), this program will continue to grow

Back to Top
ECC: Why can't we continue to serve our Early Childhood Program students in multiple locations and in multiple current elementary schools?
It is neither desirable nor educationally sound to do so for several reasons. Early Childhood includes five distinct programs because the students that it serves have such a wide variety of needs, ranging from complex autism to mild speech impairments. Often, students have to be bused to a new site each year because, as they transition through the program, the site that meets their most current needs is at a different location. This is very disruptive to the educational progress of our youngest and often most vulnerable children. From an efficiency standpoint, having all of the students educated in one location allows the therapists, speech pathologists, social workers and other support staff to spend less time traveling and more time working directly with students. The need for specialized rooms for physical and speech therapy and specially-designed bathrooms and playground equipment is unique to this age group. That is why the use of current elementary classrooms is not optimum and in many cases requires expensive modifications. In sum, both educationally and economically, one location for the Early Childhood Program is highly desirable and much preferable.
Back to Top
Financial: Can District 203 get a State Construction Grant for the building projects?
No. The State does not have a construction program currently. While there is interest in the legislature to budget one, it is unlikely to impact this year. State law requires a School District to have an application processed and an official entitlement letter from the State prior to any referendum. The State will not evaluate applications or issue any entitlement until a viable program is funded. There is already a backlog of Districts that are owed money as well as 299 applications that have not been evaluated for entitlement.
Back to Top
Financial: District 203 is using Site and Construction funds totaling $32.7 million – where did that come from?

The Site and Construction Fund was created in 2006 with the land sale of Walnut Woods for $5.8 million. District 203 added $6.2 million to that in 2007 (from operating funds) and plans to add $10 million in 2008, $4 million in 2009, $5 million in 2010, and $.2 million in 2011. The remainder ($1.5 million) is interest income on the balance. The amounts added by District 203 each year are based on year-end budget revenue over expense. 

In 2008, an additional $5 million over that planned (total of $10 million shown above) was added due to higher interest income and increased state grants.  Projected revenue exceeding expense in 2009 through 2011 is based on projected reductions in health insurance costs based on a recent plan change and salary costs set by recent contractual agreements.

Back to Top
Financial: How is the estimate of $82 arrived at? What does it mean to me?

The bonds will be issued in 2008 and repaid over 20 years in equal principal and interest payments each year. Using an estimated interest rate that is .5% higher than current rates, these payments will require an annual tax levy of about $3.39 million each of the 20 years (see “Estimated Tax Impact of $43 Million Bond Issue” in the Facilities Financing section of  District 203 Plan for Upgrading School Facilities 2007-2012). 

The average residential Equalized Assessed Value in the School District (DuPage County) for 2006 is $106,813.  The estimated levy for the debt will cost this average residential property $82.

Another way to estimate the cost is that it is $77.13 for every $100,000 of billing value shown on your 2006 tax bill. The “billing value” in DuPage County is the same as the “net equalized assessed value” in Will County.  So, divide this value by $100,000 and then multiply it by $77.13 to arrive at your estimated tax cost for the proposed bond issue.

Back to Top
Financial: Can the $82 estimated tax impact change over the years the bond is repaid? 

Once the bonds are sold, the tax levies to repay the bonds will be locked in place. The tax impact ($82 for the average residential property) will be about the same each of the 20 years it takes to repay the bonds (see “Estimated Tax Impact of $43 Million Bond Issue” chart in the Facilities Financing section of District 203 Plan for Upgrading School Facilities 2007-2012). Typically, properties are reassessed each year. As long as an individual property matches the average rate of change in assessment, the tax bill for the bond repayment should be about the same each year.

For example, if a property increases in assessment by 5% and the average reassessment increase throughout the District is 5%, then individual property owners will pay the same amount toward the bond issue as the prior year. If a property increases in assessment by 10% and the average reassessment increase throughout the District is 5%, then that individual property owner will pay a little more than was paid the prior year. At the same time other property owners will pay a few dollars less as the total amount to be collected for this bond issuance remains the same each year.  It is assumed that over the twenty-year period yearly fluctuations for an individual property owner in comparison to the District average would even out.

Back to Top
Financial: Explain the bond issue further. What are some of the details? Are there different ways to issue the bonds?

When bonds are issued, the purchaser can sometimes bid a premium (provide more funds) above the face amount of the bonds. This amount can be relatively small (less than 1% of the face amount) or it could be significant – even several million dollars. However, all of it (the face amount of the bonds as well as any premium) has to be paid back with interest – so a significant premium (in addition to the face amount of $43 million, in the case of District 203) would drive up the cost of the bond to taxpayers. The Board of Education is committed to collecting no more than $43 million in funds toward the project – as indicated by the “Estimated Tax Impact of $43 Million Bond Issue” chart in the Facilities Financing section of District 203 Plan for Upgrading School Facilities 2007-2012.

“Zero coupon bonds” are bonds with no regular interest payment – all of the interest is paid when the bond comes due.  This can lower the initial payments, but increase the payments in later years – usually costing more than simple regular interest paying bonds in the long run.  “Zero coupon bonds” are not being used.

Back to Top
Financial: Some community members continue to raise concerns about how the 2002 operating referendum was phased-in and the additional money that the District collected that was above its 2002 referendum projections. How does that referendum relate to this one?

This ballot question is about facilities and using a “fixed” funding method. In this referendum, the District is proposing a $114.9 million facilities project, asking the voter for permission to issue $43 million in bonds. The remaining $71.9 million is being funded by other sources:

a.  Sale of Walnut Woods - $5.8 million
b.  Land Cash money - $1.2 million
c.  Interest Income - $3.5 million
d.  Operating budget allocation - $25.4 million
e.  Borrowing against TIF - $36.0 million

A portion of the $71.9 million, $25.4 million, is listed as a budget allocation from operating funds. In 2002, the community passed a tax rate increase referendum. This increase in taxes produced more funds than was originally projected, allowing the $25.4 million allocation, as noted above.

The 2002 referendum was an operating referendum that had to have a much more complex method of implementation based on the tax cap laws, assessed real estate values, and annual changes in the Consumer Price Index. The explanation of what happened in the phase-in of that referendum was discussed in a white paper in July 2005 – see the following link: http://www.naperville203.org/assets/2002-Referendum-Implementation.pdf. In simplest form, the District received more money in tax revenue than projected because the Equalized Assessed Value of Naperville District 203 homes went up more than projected, while the Consumer Price Index (used in applying the tax cap) was lower than anticipated. At the same time, the District lost expected revenues from the State and interest earnings, while District expenses also exceeded projections, due largely to dramatic increases in health care costs.

In 2002, the District made a projection that the District would collect $873.7 million for the next six years. The District actually received $918.9 million – or a cumulative total of $45.2 million more (4.9% over that six-year period. In essence about half of this was used to offset the negative variance of our budget projections (noted above) to meet the referendum promise of balancing the budget within five years. The remainder has been targeted for the needed building improvements. Naturally, the prediction of property tax increases is not an exact science and a reduction in property values during that period was also possible.

Due to higher than expected tax revenues, the Board of Education voted to forgo the final year of the referendum phase-in. If the District had ended the referendum implementation after two years, and the EAV went back to historical increases of 3.2% (instead of the 6%+) the budget deficit would not have been eliminated, a cornerstone of the 2002 referendum. 

Likewise, some have also asked why the District simply didn’t rebate or abate tax monies. In reality, these ideas were discussed extensively during several Board meetings, and several different proposals were considered. Ultimately, the Board of Education decided on a middle ground – to forgo the final year of implementation and move surplus operating funds into a Site and Construction fund pending the outcome of the facilities study. Using the money for the facilities is essentially a “give back” because the referendum increase is reduced by at least $25.4 million; in fact, it is leveraged because there won’t be interest charged for bond repayments on this amount. Finally, the use of the Warrenville TIF money for facilities (and not operating funds) can be viewed as a return of $3.0 million each and every year.

Back to Top
Financial: Why is the District asking voters for a $43 million referendum? Isn’t enough money available for facilities so that a referendum is not required?
Since the District has committed to funding $72 million from other sources (budget surplus money over several years, use of money from the Cantera TIF, land sales, etc.) this money could be used for facilities, but it would require the District to make some difficult decisions about which projects would have to be reduced or eliminated – not all that is being proposed could be completed. The scope of work at Naperville Central, in particular, would have to be reduced. Such an approach would run counter to the recommendations that emerged from the Facilities Task Force and 40-plus community engagement meetings that encouraged the School Board not to take a “band-aid” or “piecemeal” approach to our facilities needs, as may have been done in the past. Finally, the renovations and additions proposed for Naperville Central and several other sites are interrelated to each other; doing some, but not all, would be difficult and not cost-effective.
Back to Top
Financial: How will the use of operating funds for capital projects impact the District in the long-term, i.e., will it bring about another operating fund referendum in the near future?
The District’s projections have included the use of funds, as described, for the facilities program. The projection predicts that the operating budget would be balanced (revenue equal to or exceeding expenditures) through 2014. There are many assumptions that make up this projection. The financial projection and assumptions are contained in the 2007-08 budget document, available at the public libraries and on the District 203 website at: http://www.naperville203.org/assets/NCUSDBudget07-08.pdf.
Back to Top
Financial: What happens if a true recession or severe economic downturn hits? What if home values and assessments start to tumble, thereby creating increases in capped and bonded rates, or both, at a time when people won’t be able to afford it?

If the referendum passes, the District will issue bonds and set the tax levies needed to repay the bonds. The County will extend these taxes every year, no matter what happens with assessments and home values. If interest rates hold or continue to decline until the time of issuance, the cost to the District would be reduced and this would benefit taxpayers. 

The operating taxes are different and are limited by the Tax Cap. The District typically levies and collects taxes as limited by this statute. If CPI (Consumer Price Index, a measure of inflation) continues at the average pace of 2.5% despite falling assessments, the District would still be able to levy up to the Tax Cap limit. Assessments, as a whole, would have to fall at least 25% before the legal tax rate maximums of individual fund tax levies would come into play. For example, the District has a maximum legal rate of $4.00 for the Education Fund and is currently at $3.3465 for the 2006 levy. By 2008 (2007 assessments are already in place and increased from 2006), that rate should be about $3.0555 with the predicted EAV (Equalized Assessed Value) in our projections. That predicted EAV would have to be reduced almost 25% before the legal maximum of $4.00 is hit.

Should there be a major recession or severe economic downturn, the Board of Education would have to consider the impact of levying property taxes in the context of a severe economic  environment.  All local governments would have to establish priorities in light of the impact on taxpayers.

Back to Top
Financial: How do recent economic events play into the District operating budget and the proposed bond issue?

The District 203 2007-08 Budget includes a section titled "Financial Projection – Trends and Assumptions."  This document was prepared in April of 2007 – prior to the Board of Education finalizing the Master Facilities Plan and resolution to place a question on the February ballot. This projection does not include an increase of $9.2 million in additional funding for the facilities projects as outlined in the District 203 Plan for Upgrading School Facilities 2007-2012, so anticipated fund balances would have to be reduced accordingly.

Additionally, many events have occurred after the preparation of this financial projection. Among those events, interest rates have significantly declined. Future revenue from interest income would likely be reduced by about $2 million per year. Other revenue and expense estimate changes will effect the financial projection as well.

The bond issue interest rate is not tied directly to short term interest rates. A better gauge of this would be the Bond Buyer 20 Bond Index. This index has declined about 25 basis points (.25%) since last fall and is almost a full percent (1.00%) below the estimated interest rate used in the "Estimated Tax Impact." The bonds will be fixed-rate bonds and we expect a “Aa3” or better rating from Moody's. That will help keep the borrowing costs down.